AU Tier 0–1 production testing shell demo launched separately

Operational launch pad for Australian recall-readiness testing.

Start from the live obligations calendar, quantify proof of need with an editable impact model, then open the test platform or the guided demo. The production shell is designed for workflow testing first. The demo layer stays separate and accessible from here.

What this entry page now does

It is no longer a brochure page. It is the operational front door for internal testing and customer-facing proof-of-need framing.

Stage 1 live
21 Mar 2026
Stage 2
1 Apr 2028
UDI start
1 Jul 2026
PB980 proof case
Open

Obligations calendar

Use this as the default first screen for Australia. It anchors the platform to the dates that matter operationally and helps frame urgency without overclaiming automation.

21 Mar 2026

Healthcare-facility Stage 1 mandatory reporting starts

Australian hospitals must report death, serious injury, or serious deterioration events involving high-risk devices in the first stage. The testing platform treats this as the main reporting clock for ASDER/IRIS route logic.

1 Jul 2026

UDI starts for Class III and Class IIb devices

This is the first major AU device-identity milestone relevant to high-risk and implantable medical devices. It supports device master enrichment and later serial-level workflows.

1 Apr 2028

Healthcare-facility Stage 2 starts

Medium-risk device events and near misses expand the mandatory reporting scope. This is where the production platform needs mature routing, proof, and inventory readiness.

1 Jul 2028

UDI starts for Class 4 and Class 3 IVDs

Keep this visible in the obligations view because the timing matters for AU roadmap conversations and data-model readiness.

Platform interpretation

Fast-refresh recall and reporting logic first. Scheduled master-data refresh second. Local inventory and proof remain the decisive closure layer.

Commercial interpretation

Hospitals need workflow, proof, and closure confidence before they need architecture depth. That is why the testing platform comes first and the demo layer stays separate.

Proof of need

Use this editable model during testing and outreach. Figures are scenario inputs, not legal or financial advice.

AUD 105,168
Estimated annual operational saving from workflow compression plus avoidable external expert effort.

Proof-of-need blocks for the main page

These blocks can be shown before launch into either the testing platform or the demo. They keep the first page operationally persuasive without pretending to offer legal cost guarantees.

Risk

Serial-scoped recalls still leave hospitals blind

Global recalls may publish serials without country allocation or hospital mapping. The local inventory bridge is what turns signal into exposure truth.

Non-compliance

Reporting and proof failures are workflow failures

Operational risk comes from missed route decisions, missing submission proof, incomplete exception handling, and weak closure evidence, not only from device defects themselves.

Saved expert effort

Reduce dependency on scattered specialist work

Structure the case once so biomedical, quality, governance, IT, and external advisors work from one evidence chain instead of recreating the case repeatedly.